1
/
of
9
Text block
SKU:BLL033
Classy Living
Poet'S Curve I - 14 X 14 - Metal Accent Lamp (Set of 2) - Matte Blush Pink
Poet'S Curve I - 14 X 14 - Metal Accent Lamp (Set of 2) - Matte Blush Pink
Regular price
$109.99 USD
Regular price
$139.99 USD
Sale price
$109.99 USD
In stock
Quantity
Couldn't load pickup availability
A slender bent stem and elongated curved reflector give this metal accent lamp set a quietly graphic presence, softened by a matte blush pink finish and matte white shade interior. Round bases keep the silhouette simple on bedside tables or a writing desk, while the pair creates a coordinated look across a room. In-line cord switches offer straightforward control, and each lamp accepts a replaceable T6 LED bulb with an E12 base, sold separately.
Product Features
Poet'S Curve I - 14 X 14 - Metal Accent Lamp (Set of 2) - Matte Blush Pink
7.0in L, 13.8in W, 14.5in H, and 3.09 lb
Product Features
- Two matching accent lamps bring coordinated color to paired tables or separate corners.
- Matte blush pink metal and curved shades add soft color.
- In-line switches simplify control; 72-inch cords offer placement flexibility.
- Replaceable T6 LED bulbs with E12 bases allow bulb replacement; bulbs sold separately.
Poet'S Curve I - 14 X 14 - Metal Accent Lamp (Set of 2) - Matte Blush Pink
7.0in L, 13.8in W, 14.5in H, and 3.09 lb
Share
