1
/
of
9
Text block
SKU:BLL034
Classy Living
Poet'S Curve II - 14 X 14 - Metal Accent Lamp (Set of 2) - Powder Blue
Poet'S Curve II - 14 X 14 - Metal Accent Lamp (Set of 2) - Powder Blue
Regular price
$109.99 USD
Regular price
$139.99 USD
Sale price
$109.99 USD
In stock
Quantity
Couldn't load pickup availability
Powder blue brings a cool, playful note to this metal accent lamp set, with slender bent stems and elongated curved reflector shades balanced above simple round bases. Matte white shade interiors complement the blue exterior, making the pair an inviting choice for bedside tables or a home office. Each plug-in lamp has an in-line cord switch and accepts a replaceable T6 LED bulb with an E12 base, sold separately, for everyday accent lighting.
Product Features
Poet'S Curve II - 14 X 14 - Metal Accent Lamp (Set of 2) - Powder Blue
7.0in L, 13.8in W, 14.5in H, and 3.09 lb
Product Features
- Two matching accent lamps make coordinating bedside tables easy.
- Powder blue metal shades add fresh color and sculptural curves.
- In-line switches simplify control, while 72-inch cords offer placement flexibility.
- Replaceable E12-base T6 LED bulbs allow easy replacement; bulbs sold separately.
Poet'S Curve II - 14 X 14 - Metal Accent Lamp (Set of 2) - Powder Blue
7.0in L, 13.8in W, 14.5in H, and 3.09 lb
Share
